Saturday, June 16, 2012

Nightstand Studio Progess Blog 5

The initial framing is officially over and the HVAC is starting to be installed. We have settled on a phone provider and are now finalizing the equipment lease for the lighting grid and the recording studio.
Some more pics below:
The space for my future office.
The rough framing for the big inside overhead door.
The new side door.
Air conditioning units 20 ft up.
Framing for the isolation booths in the recording studio.