Nightstand Studios Progress Blog 8

It has been a month since my last post. One would hope that great progress has been made since then. Well YES it has, and we are getting close to opening day. If PSE&G brings us our new power in the next week, we should be ready for our Oct 1 opening. Floors are being installed, as well as painting, ceilings, and lights are near completion. Furniture will start arriving next week! We will be in production before we know it. More pics to follow.

Tuesday, July 31, 2012

Nightstand Progress Blog 7 Quiet Rock

Exciting to come into the building today as two studios, along with the green rooms and office areas have all been sheetrocked. Today Quiet Rock has been installed in 2 of our 4 studios, with Studio C and the recording studio to commence tomorrow.
Check out the shots of Studios A and B below. Getting CLOSE!

Wednesday, July 18, 2012

Nightstand Studio Progress Blog 6

After a couple weeks of precision work that was not quite that demonstrative of progress, we are ready for the big push of insulation and drywalling and finally closing in the working spaces. HVAC interior work is done, the rough plumbing and electric is done, and the truckload of soundproofing insulation has been delivered. Insulation to commence tomorrow, and drywall to commence on Monday!
Pretty soon, lights, camera, action!

Pics of HVAC, our approved inspection, and the 8 skids of insulation below!

Saturday, June 16, 2012

Nightstand Studio Progess Blog 5

The initial framing is officially over and the HVAC is starting to be installed. We have settled on a phone provider and are now finalizing the equipment lease for the lighting grid and the recording studio.
Some more pics below:
The space for my future office.
The rough framing for the big inside overhead door.
The new side door.
Air conditioning units 20 ft up.
Framing for the isolation booths in the recording studio.

Saturday, May 19, 2012

Nightstand Studio Progress Blog 4

Well , we are almost done with the framing work. Some big steel coming in on Tuesday. We sign our contracts with our alarm and surveillance company, with our internal phone/communication being our sole outstanding company to still hire.

Find below a shot of studio C without the back wall and a shot of studio B.

Will post more as we make progress.

Randy

Tuesday, May 15, 2012

Nightstand Studio Blog 3 Framing Shots

Progress, progress, progress!!
Framing is well underway for the two multipurpose studios. See below, studio A, our 38x38x14 studio, and Studio B our 32x65x19 studio and scoring stage.

Sunday, May 13, 2012

Nightstand Studio progress Blog 2

Framing is now underway. It is a relief after all this time (nearly 9 months) to finally be walking through skeletal hallways and spaces that will become studios before we know it. How exciting, relieving, and terrifying all at once. The closer it gets the more work you realize you still have ahead of you to bring a dream to reality.
Tomorrow I'll post some pics of the future entryway and Studio A space.

Wednesday, May 9, 2012

Nightstand Studios Building Blog

Hello everyone. I've taken some time off from blogging, spending time being a principal, dad, husband, and pursuing the insanity of GCing the build of Nightstand Studios. Several people have asked for an account of the build process. What is to follow in the next couple months will be just that - a behind the scenes look at our building the future home of Nightstand Studios. This entry contains the building in its original state and the building today. Making progress! Hope you enjoy this journey.